A relocation stalls more often over an unready destination than over anything on the road. If the pad is not built and the utilities are not stubbed, the home has nowhere to go.

A prepared concrete pad and garage foundation waiting for a home to be set
Typical duration
1–3 weeks
Priced by
Site assessment
Permit lead time
2–6 weeks

What’s included

Everything on this list is in the price.

If something falls outside it, we tell you before the work starts, not after.

Site grading and compaction to the required bearing capacity
Pier footings or full engineered slab
Perc test coordination and septic system install
Water, sewer, electrical, and gas stub-out to the home footprint
Drainage cut so water moves away from the crawl space
Driveway and approach grading for the delivery rig

Process

How this stage runs.

01

Assess

We evaluate soil, slope, drainage, and access, and confirm the rig can physically reach the pad location.

02

Perc and permit

Septic requires a perc test and a health department permit. We schedule both early because they set the timeline.

03

Grade and pour

The site is cut, compacted, and footed or poured to the support plan for your home's weight and footprint.

04

Stub utilities

Every connection is brought to the footprint and capped, ready for tie-in the day the home lands.

Questions

What people ask about septic & pad prep.

Still unsure about something? Ask us directly — we answer before you commit to anything.

Read every question

Other stages

Most moves need more than one of these.

All services

Price it

Add septic & pad prep to your estimate.

Your estimate itemizes every stage separately, so you can see exactly what each one costs before you commit to any of it.