Septic & pad prep
A relocation stalls more often over an unready destination than over anything on the road. If the pad is not built and the utilities are not stubbed, the home has nowhere to go.

- Typical duration
- 1–3 weeks
- Priced by
- Site assessment
- Permit lead time
- 2–6 weeks
What’s included
Everything on this list is in the price.
If something falls outside it, we tell you before the work starts, not after.
Process
How this stage runs.
Assess
We evaluate soil, slope, drainage, and access, and confirm the rig can physically reach the pad location.
Perc and permit
Septic requires a perc test and a health department permit. We schedule both early because they set the timeline.
Grade and pour
The site is cut, compacted, and footed or poured to the support plan for your home's weight and footprint.
Stub utilities
Every connection is brought to the footprint and capped, ready for tie-in the day the home lands.
Questions
What people ask about septic & pad prep.
Still unsure about something? Ask us directly — we answer before you commit to anything.
Other stages
Most moves need more than one of these.
Price it
Add septic & pad prep to your estimate.
Your estimate itemizes every stage separately, so you can see exactly what each one costs before you commit to any of it.