SafeHaulHomes

Mobile home skirting installation

Skirting keeps the crawl space dry and the plumbing from freezing. Most counties won't pass a home at final inspection without it.

A tree-lined manufactured home park on a summer day
Typical duration
1 day
Priced by
Perimeter foot
Standalone service
Yes
Email us for pricing

We price this per job rather than posting a figure. Tell us your dates and what you can handle yourself, and we email you the number.

What’s included

Everything on this list is in the price.

If something falls outside it, we tell you before the work starts, not after.

Vinyl, metal, or simulated masonry panels
Ventilation sized to the crawl space footprint
Hinged access panel at every utility connection
Bottom rail set below grade line for wind resistance
Insulation backing in freeze-prone counties
Removal and disposal of old skirting

Process

How this stage runs.

01

Measure

We measure the full perimeter including hitch end and any bay projections, and confirm the grade line.

02

Set rail

We trench and set the bottom rail so wind cannot lift the panels off the ground.

03

Panel

We cut, seat and lock the panels to the top track, leaving room for them to expand as temperatures swing.

04

Vent and access

We place vents to code and cut an access panel at every utility connection.

Questions

What people ask about skirting.

Still unsure about something? Ask us directly. We answer before you commit to anything.

Read every question

Other stages

Most moves need more than one of these.

All services

Price it

Add skirting to your estimate.

Your estimate itemizes every stage separately, so you can see exactly what each one costs before you commit to any of it.