A home that arrives undamaged and is then set wrong will show it within a year — in the doors, the drywall, and the floor. Setup is where the move is actually finished.

Modular home sections beside a freshly poured foundation
Typical duration
1–2 days
Priced by
Flat rate
Inspection ready
Same day

What’s included

Everything on this list is in the price.

If something falls outside it, we tell you before the work starts, not after.

Pier layout and blocking to the manufacturer's support plan
Ground anchors and tie-down straps rated for your wind zone
Marriage line closure and section fastening on multi-section homes
Perimeter and centerline support verification
Documentation package for the county inspection
Return visit if the inspector flags anything

Process

How this stage runs.

01

Pad check

We verify the pad is level, compacted, and draining away from the home before a single pier goes down.

02

Block and shim

Piers are set to the support plan, then shimmed until the frame carries evenly across every point.

03

Marry sections

Multi-section homes are pulled together at the marriage line, sealed, and fastened along the full length.

04

Anchor

Ground anchors are driven and strapped to the wind zone rating for your county, then torque-checked.

Questions

What people ask about setup.

Still unsure about something? Ask us directly — we answer before you commit to anything.

Read every question

Other stages

Most moves need more than one of these.

All services

Price it

Add setup to your estimate.

Your estimate itemizes every stage separately, so you can see exactly what each one costs before you commit to any of it.