A home that arrives undamaged and is then set wrong will show it within a year — in the doors, the drywall, and the floor. Setup is where the move is actually finished.

- Typical duration
- 1–2 days
- Priced by
- Flat rate
- Inspection ready
- Same day
What’s included
Everything on this list is in the price.
If something falls outside it, we tell you before the work starts, not after.
Process
How this stage runs.
Pad check
We verify the pad is level, compacted, and draining away from the home before a single pier goes down.
Block and shim
Piers are set to the support plan, then shimmed until the frame carries evenly across every point.
Marry sections
Multi-section homes are pulled together at the marriage line, sealed, and fastened along the full length.
Anchor
Ground anchors are driven and strapped to the wind zone rating for your county, then torque-checked.
Questions
What people ask about setup.
Still unsure about something? Ask us directly — we answer before you commit to anything.